Fenwick Primary
A timber-clad teaching block for 210 pupils, built ten metres from classrooms that never stopped being used.
Client
Sheffield City Council
Sector
Education
Location
Sheffield
Size
2,950 m²
Contract value
£7.6m
On site for
60 weeks
Programme
The brief
Fenwick Primary had outgrown its 1960s building. The council needed seven new classrooms and a hall, and the school needed to keep teaching throughout.
How we built it
The block is a cross-laminated timber frame, made off site and assembled in eleven days during the Easter holiday. Everything noisy was planned for holidays and weekends, and deliveries arrived before eight or not at all.
Our site manager gave an assembly every half term so that the children knew what the machines were doing.
The result
The school moved in on the first day of the autumn term as planned. Two of the Year 6 pupils have since written to ask how to become engineers.
They built a teaching block ten metres from classrooms in session, and we did not lose a single school day.
Helen Marsh, headteacher