Hover for the drawing

All projects

Fenwick Primary

A timber-clad teaching block for 210 pupils, built ten metres from classrooms that never stopped being used.

Client

Sheffield City Council

Sector

Education

Location

Sheffield

Size

2,950 m²

Contract value

£7.6m

On site for

60 weeks

Programme

How the build was sequenced, trade by trade

Week 0Week 15Week 30Week 45Week 60
Groundworks
Frame
Envelope
Mechanical and electrical
Fit-out
Externals and handover
Complete Under way To comeHanded over · 60 weeks

The brief

Fenwick Primary had outgrown its 1960s building. The council needed seven new classrooms and a hall, and the school needed to keep teaching throughout.

How we built it

The block is a cross-laminated timber frame, made off site and assembled in eleven days during the Easter holiday. Everything noisy was planned for holidays and weekends, and deliveries arrived before eight or not at all.

Our site manager gave an assembly every half term so that the children knew what the machines were doing.

The result

The school moved in on the first day of the autumn term as planned. Two of the Year 6 pupils have since written to ask how to become engineers.

They built a teaching block ten metres from classrooms in session, and we did not lose a single school day.

Helen Marsh, headteacher

Next project

Holloway Terrace

Start a project

Have a site, a sketch or just a question?

Or call 0161 496 0127

Start a project

Have a site, a sketch or just a question?

Or call 0161 496 0127

Massif

Design and build contractor for homes, workplaces and public buildings across the North of England.

Massif

© 2026 Massif Construction Ltd. Registered in England, no. 04417328.

© 2026 Massif Construction Ltd. Registered in England, no. 04417328.

Massif, a Framer template by Ajoy

Massif, a Framer template by Ajoy

Create a free website with Framer, the website builder loved by startups, designers and agencies.