Planning permission in 2026: a short guide for homeowners

What needs permission, what does not, and how long each route really takes.

Written by

Selam Tesfaye

Not every project needs planning permission, and the ones that do are not all equally slow. A short guide to the routes.

Permitted development

Many single-storey rear extensions, loft conversions and outbuildings can be built without an application, within set limits on size and height. We still recommend a lawful development certificate so that you have it in writing.

Householder applications

For anything larger, or anything in a conservation area. The target is eight weeks from validation. Allow twelve.

Listed buildings

Listed building consent is needed for almost any change, inside or out, and runs alongside planning. Allow four months.

What speeds things up

Talking to the neighbours before the notice goes up, and drawings that answer the planning officer’s questions before they are asked.

Keep reading

More from the journal.

The three most recent pieces, newest first.

The three most recent pieces, newest first.

Start a project

Have a site, a sketch or just a question?

Or call 0161 496 0127

Start a project

Have a site, a sketch or just a question?

Or call 0161 496 0127

Massif

Design and build contractor for homes, workplaces and public buildings across the North of England.

Massif

© 2026 Massif Construction Ltd. Registered in England, no. 04417328.

© 2026 Massif Construction Ltd. Registered in England, no. 04417328.

Massif, a Framer template by Ajoy

Massif, a Framer template by Ajoy

Create a free website with Framer, the website builder loved by startups, designers and agencies.