Calder Row
Forty-two apartments on a canal-side plot barely wider than a tennis court, built with the towpath open every single day.
Client
Calder Homes
Sector
Residential
Location
Manchester
Size
42 apartments
Contract value
£11.8m
On site for
64 weeks
Programme
The brief
Calder Homes owned a long, narrow strip between a canal and a main road. They needed forty-two apartments on it, a brick façade the planners would accept, and no closure of the towpath that half the neighbourhood uses to get to work.
How we built it
With no room for a tower crane base on the plot, we lifted everything from a single position on the road side and scheduled deliveries inside a two-hour night window. The frame is concrete to first floor and light steel above, which took nine weeks out of the programme.
Brickwork was laid from mast climbers rather than scaffold, keeping the canal edge clear. The site manager walked the towpath every morning before the gates opened.
The result
Handover came five weeks early and on the original contract sum. Thirty-eight of the forty-two apartments were let before the scaffold came down, and there was not a single complaint from the canal trust.
Massif priced the job once and the number never moved. We opened the building on the date they gave us fourteen months earlier.
Imogen Hartley, Calder Homes