Hover for the drawing

All projects

Aster Court

Two precast concrete blocks around a shared courtyard, with the façade going up four levels at a time.

On site now

Client

Meridian Estates

Sector

Residential

Location

Manchester

Size

96 apartments

Contract value

£24.5m

On site for

96 weeks

On site this week

Façade panels, levels 4 to 9

Programme

0% completeFeb 2027
0% completeFeb 2027

Programme

How the build was sequenced, trade by trade

Week 0Week 24Week 48Week 72Week 96
Groundworks
Frame
Envelope
Mechanical and electrical
Fit-out
Externals and handover
Complete Under way To come0% of 96 weeks

The brief

Meridian Estates is building ninety-six apartments for rent on the edge of the city centre. The design calls for deep precast balconies that give every flat an outdoor room.

How we are building it

The frame is in-situ concrete, poured a floor every nine days. Façade panels follow four levels behind, lifted in the gaps between concrete pours so that one tower crane serves both trades.

Block A is watertight. Block B has panels fitted to level nine, with windows following two floors below.

What comes next

Internal fit-out starts on the lower floors of Block B this winter. Handover of both blocks is programmed for February 2027.

We can see exactly where the build is every Friday. It has changed how we report to our own board.

Sanjay Rao, Meridian Estates

Next project

Tannery Works

Start a project

Have a site, a sketch or just a question?

Or call 0161 496 0127

Start a project

Have a site, a sketch or just a question?

Or call 0161 496 0127

Massif

Design and build contractor for homes, workplaces and public buildings across the North of England.

Massif

© 2026 Massif Construction Ltd. Registered in England, no. 04417328.

© 2026 Massif Construction Ltd. Registered in England, no. 04417328.

Massif, a Framer template by Ajoy

Massif, a Framer template by Ajoy

Create a free website with Framer, the website builder loved by startups, designers and agencies.